Client – Wellington International Airport Limited


This $60M multi-level structure provides a transport hub and 1000 carparks for airport users. The design and construction process included installing the most up to date precast design and seismic protection technology. The foundation had over 4000m3 of concrete to form one of the biggest raft slabs constructed in Wellington at the time. Structure comprised of over 1500 precast units. Close coordination of construction activities ensured that public access to the rest of the airport was maintained 24 hours a day.